ABC Rural, Friday April 12, 2013 |
RIL selects Phillips 66's E-Gas Technology
The Hindu Business Line | May 22, 2012
Reliance Industries Ltd (RIL) on Tuesday announced it has selected Phillips 66’s E-Gas technology for its planned gasification plants at Jamnagar in Gujarat.
...
The largest gasification project in the world...
The planned gasification plants at Jamnagar will process petroleum coke and coal into synthesis gas utilizing the new technology. The synthesis gas will be used as feedstock for a new chemical complex and will fuel the refinery's existing gas turbine power generation units... (Read more...)
... The E-Gas technology has been utilized in commercial applications since 1987. It incorporates a gasification system design that can be applied with gas and steam turbine combined-cycle power generation to produce electric power, as well as synthesis gas applications for the production of hydrogen, chemicals or substitute natural gas in highly flexible combinations.
It is among the cleanest and most efficient commercial technologies for coal or petroleum coke-based electric power generation and syngas production. It offers high system efficiencies, minimized water consumption and very low emissions...
Using the technology China, India, Pakistan and other countries have acquired, Australia's energy needs can be met with no coal seam gas and half of its existing coal mine output.
- The cost-savings for Australian industry are substantial.
- Australian industry would benefit from increased international competitiveness.
0 comments:
Post a Comment